Hay Group, Manchester
The installation presented a challenge, as the external fabric of the building could take no additional load. The solution was to incorporate a steel post into the wall jamb to transfer the load to the floor structure. This was no problem to Creatif, who always assess each project individually, and design the system accordingly.
So some agile thinking by Creatif delivered a flexible moving wall solution for an agile workspace.