Creatif Logo
Contact us creatif
Search creatif
Shoosmiths case study
Special-Projects / Shoosmiths

Shoosmiths

Creatif manufactured and installed two high dB moving walls in the prestigious offices of one of the UK’s biggest legal practices located in the Spinningfields complex in Manchester.
 
At the same time we relocated an existing moving wall to a totally different floor in the same building…all whilst the client was in occupation.
 
The first phase required Creatif to work closely with the fit-out contractor’s design and site staff to coordinate the removal of a wall installed by Creatif a year ago. Careful attention to detailing was needed as the ceiling height on the new forth floor location was different to that on the old seventh floor location.
 
Concurrent with the relocation, Creatif manufactured two new moving walls and installed all new track and abutments. Because the ceiling void was obstructed by air conditioning louvres and ductwork the track was positioned below the ceiling and trimmed with white MFC pelmets.
 
The full-height glazing and generous ceiling height contributes to the sense of openness – especially noticeable when both moving walls are in the open position, giving superb views across the Manchester skyline. Unfortunately this ceiling height was higher than standard MFC boards so we used a maple-finish laminate.
 

End result…happy client, no downtime and totally flexible space..

 

» Download PDF

 

Please register to access our downloads section where you will find useful material including: product and company information, case studies and technical information.
If you have a pop up blocker on your browser this download with not open.

Please send me the latest offers and news. For more information, please view our Privacy policy Register close